Turnkey Installation

Performance-Driven Improvements. Knowledge to Achieve the Results.

Project execution is an important part of a holistic program to improve performance, flexibility, and reliability or to reduce operating costs. Whether big or small, the level of success in the implementation of the project will impact how sustainable the desired results are over time. And these results are only realized when the work is executed in alignment with the intended results. When Neundorfer is involved in project execution, we work hard to carry the original intent and objectives of the project all the way through execution, so you realize the results you need.

capabilities-turnkey_installation-3x

Click to expand.

Neundorfer has the experience and knowledge to recommend the most economical and efficient approach for your plant, whether it’s a new installation, rebuild/overhaul, or upgraded system. We do not offer cookie cutter solutions, because you don’t have a cookie cutter situation. We understand your variables, challenges, and objectives, so we are able to develop solutions that are practical and economical. We strive to deliver high quality results “ on time and within budget. You define success. We help you achieve it.

What We Do

We are flexible so that we can customize an approach that best fits the specific situation or need. We have knowledgeable, experienced professionals at every level so that the work being executed is done with quality, on-time, and in service of your intended results. We can help whether we are just providing guidance or performing a complete turnkey project.

Neundorfer Offers:

  • Scheduled outage management and scope of work optimization
  • On-Site Technical direction during project implementation or maintenance work
  • Start-Up/ Commissioning Services
  • Complete turnkey project capabilities including; project task development and optimization, experienced labor, site supervision, equipment, project management.

Files & Resources

Baghouse Integration Dramatically Reduces O&M Costs

Fly Ash System

A 1,500 MW Southeastern U.S. coal-fired power plant was able to improve the effectiveness of their fly ash evacuation systems and reduce the costs of operation and maintenance by an expected 50% through improved, integrated instrumentation. ...

Read the White Paper

"We now have a more flexible system that we are expecting to reduce our operation and maintenance costs by 50%. "

Plant Engineer

Southern Utility