Nov 2020 - Cement Plant Gains Consistent Operations

With weak links in air pollution control equipment, a Midwestern cement pant needed to balance 3 things to make best use of short outages: cost, outage time, and performance gains. Read how Neundorfer identified realistic options to improve reliability and performance of the ESP and more in the November 2020 edition of Optimized Insights.

Download Nov 2020 Optimized Insights

Go Back

Baghouse Integration Dramatically Reduces O&M Costs

Fly Ash System

A 1,500 MW Southeastern U.S. coal-fired power plant was able to improve the effectiveness of their fly ash evacuation systems and reduce the costs of operation and maintenance by an expected 50% through improved, integrated instrumentation. ...

Read the White Paper

"We now have a more flexible system that we are expecting to reduce our operation and maintenance costs by 50%. "

Plant Engineer

Southern Utility

Back to Top