Nov 2020 - Cement Plant Gains Consistent Operations

With weak links in air pollution control equipment, a Midwestern cement pant needed to balance 3 things to make best use of short outages: cost, outage time, and performance gains. Read how Neundorfer identified realistic options to improve reliability and performance of the ESP and more in the November 2020 edition of Optimized Insights.

Download Nov 2020 Optimized Insights

Go Back

SmartAsh Case Study

SmartAsh Case Study

A large power generation plant needed to improve its fly ash evacuation system and turned to Neundorfer. The system, serving 20 hoppers on three separate precipitators, was upgraded without requiring an outage. ...

Read the White Paper

"We now have a lot more information about the system and its operation, allowing us to solve problems more quickly and operate more efficiently."

System Owner

Coal-Fired Power Plant